The end-of-life date for Umbraco 13 is 14 December 2026. Umbraco 17 is supported until 27 November 2028, including its security phase. Upgrading keeps your site patched, moves it to .NET 10 and gives editors the new backoffice. If you cannot upgrade straight away, read the options, including extended support.
What changes between version 13 and 17
A new backoffice built on web components replaces AngularJS, so custom extensions are rebuilt
Macros, Nested Content and the legacy Grid need to move to blocks or partial views
The platform moves to .NET 10
Several APIs have been removed or replaced, including IPublishedSnapshot
The rich text editor is now Tiptap, and system dates are stored in UTC
Custom backoffice code is usually the hardest part of this upgrade. I have completed several Umbraco migrations to the new backoffice, including:
Custom dashboards
Custom plugins
I also build new custom plugins. During the audit I review your extensions and set out the approach for each in the written quote.
Still on Umbraco 7 or 8?
I have also done older migrations, from Umbraco 7 and 8 upwards. Both versions are past end of life (Umbraco 7 on 30 September 2023, Umbraco 8 on 24 February 2025). Moving from them is a larger job than moving from 13, because the platform has since moved to modern .NET, so I quote it after reviewing your site. Tell me which version you are on.
What is included
Technical audit and a written, fixed price
Package compatibility work and code changes
Content and database migration, rehearsed on a copy
Checks that URLs, redirects, metadata and sitemap survive, to protect search rankings
Editor walkthrough, go-live support and 30 days of bug-fix cover
How a one-week upgrade runs
Day 1: audit. Packages, backoffice extensions, content types, integrations and hosting. Backups taken and checked.
Days 2 and 3: upgrade. .NET 10, Umbraco 17, package replacements, code fixes and rebuilt backoffice extensions.
Day 4: migrate and test. Database upgrade on a copy of live data, then pages, forms, search, redirects, SEO and integrations.
Day 5: go live. Your sign-off, planned cutover with a rollback plan, then monitoring and 30 days of cover.
This is the plan for a straightforward site. Larger sites follow the same steps over a longer period.
Working with clients in the US
I work remotely and overlap with US Eastern mornings. Work progresses before your day starts, so you can begin with an update and something to review. Priced and invoiced in US dollars (USD).
50% to start, 50% at go-live. Third-party licence fees are not included.
Technical audit of your site
Fixed price in writing before work starts
Packages and custom code updated
Content and database migration
Testing on a copy of your live site
SEO checks: URLs, redirects, sitemap
Go-live support
30 days of bug-fix cover
Umbraco upgrade questions
When is Umbraco 13 end of life?
The end-of-life date for Umbraco 13 LTS is 14 December 2026. From that date, security fixes for version 13 require extended long-term support (XLTS) from Umbraco.
Can I upgrade directly from Umbraco 13 to Umbraco 17?
Yes. Umbraco 17 includes the database migrations from Umbraco 13, so there is no need to deploy versions 14, 15 and 16 along the way. The breaking changes from those versions still have to be handled in your code.
How long does a v13 to v17 upgrade take?
From about one week for a straightforward single site. Sites with custom backoffice extensions, many packages or complex integrations typically take two to four weeks or more.
How much does an Umbraco upgrade cost?
Upgrades start from the standard price shown on this page and depend on complexity. After reviewing your solution I confirm a price in writing before any work starts.
Will my website go offline during the upgrade?
The upgrade is built and tested on a copy of your site. Your live site keeps running until cutover, which is planned to keep downtime to a minimum. Content editors are asked to pause publishing for a short window.
What happens to my custom property editors and dashboards?
Umbraco 14 replaced the AngularJS backoffice with one built on web components, so AngularJS extensions have to be rebuilt. This is often the biggest factor in the price. I review yours during the audit and set out the approach in the written quote, so you can judge it before committing.
Have you done backoffice migrations before?
Yes. I have completed several Umbraco migrations to the new backoffice, including custom dashboards and custom plugins, and I build new custom plugins.
Can you upgrade Umbraco 7 or Umbraco 8 sites?
Yes. I have done migrations from Umbraco 7 and 8 upwards. These are larger jobs than a 13 to 17 upgrade, so they are quoted after a review of your site and the upgrade starting price does not apply.
How soon can you start?
I work solo, so it depends on what is already booked. The availability badge at the top of the site shows whether I am taking new work, and I confirm a start date in writing before you commit.
Do you work with agencies?
Yes. I can work under your agency's process, in your repositories and project tools, including white-label delivery.
Send me your version and package list
Send your Umbraco or Optimizely version and what you need. I will reply with next steps and a price range.